Update work Strukton construction of 5 aircraft stands

Construction of the 5 aircraft stands at Twente Airport is progressing rapidly.

Strukton: "Nice assignment from Twente Airport"

"That there was a need for VOPs was evident from a study initiated last year by Twente Airport together with aircraft manufacturer Airbus. However, the current situation, corona crisis, has accelerated the start-up.

If aircraft are idle, they must be permanently maintained. If this does not happen, the aircraft are not airworthy and lose their value. The maintenance is not performed by Twente Airport but Dutch maintenance companies.

At the end of April, the first aircraft will come to Twente Airport."

Read the entire article on the Strukton website.

More news
27 September: Runway Run for KiKa 2026 03 augustus 2026
Read more
Job vacancy: Airport Operations Employee (32 hours) 23 juli 2026
Read more
5 September: After Summer Fly-In Twente Airport 22 juli 2026
Read more
Update: fixed instrument approach and departure routes at Twente Airport 01 juli 2026
Read more