Update work Strukton construction of 5 aircraft stands

Construction of the 5 aircraft stands at Twente Airport is progressing rapidly.

Strukton: "Nice assignment from Twente Airport"

"That there was a need for VOPs was evident from a study initiated last year by Twente Airport together with aircraft manufacturer Airbus. However, the current situation, corona crisis, has accelerated the start-up.

If aircraft are idle, they must be permanently maintained. If this does not happen, the aircraft are not airworthy and lose their value. The maintenance is not performed by Twente Airport but Dutch maintenance companies.

At the end of April, the first aircraft will come to Twente Airport."

Read the entire article on the Strukton website.

More news
30 May 2026: Wheels & Wings at Twente Airport 21 april 2026
Read more
KLM Embraer 195 E2 back into service after a temporary grounding at Twente Airport 16 april 2026
Read more
23 March to 3 April: Orange Bull 2026 exercise at Twente Airport 13 maart 2026
Read more
Fixed instrument approach and departure routes to improve accessibility to Twente Airport 30 januari 2026
Read more